Measure Item Execution IP

Measure Item Execution IP has the following functions

  • Measurement items created with Measure Item Execution IP are processed according to the execution result of [Target Item]. (Result display of measurement item, branch processing at flow execution etc.)
  • Execute [Pre Execution Item (s)] before [Target Item].
  • Execute [Post Execution Item (s)] after [Target Item].

Add to Cart

Product GroupAlgorithm IP
CodePCXA01-M5008
Link
ManufacturerADVANTEST CORPORATION
Applicable Equipment
  • CX1000P CX1000_MCU
  • CX1000D CX1000_MCU
  • CX1000D S2-LINK CX1000_MCU
  • CX1000P MEMORY_TYPE_F
  • CX1000D MEMORY_TYPE_F

Revisions

Released atNumberDescription
July 15, 20251.02.01
  • Fixed issues:
    1. The order of pre-processing and post-processing measurement items in the [Select Pre Post Items] dialog box was not displayed correctly.
    2. When you loaded the saved work project and opened the [Select Pre Post Items] dialog box, the order of the specified measurement items was shown in the initial state (execution order in the flow). After the improvement, these settings will be displayed in the specified order.
July 11, 20231.02.00
  • OpenJDK 17 compatible.
    OpenJDK 17 is now supported. OpenJDK 8 is still available.
February 13, 20181.00.00

First edition