Question
What are situations that need to run DC calibration (light)?
Answer
Execute DC calibration (light) at the following situation:
- 30 minutes after Cloud Testing ™ Lab is started
- 24 hours after DC calibration execution
For DC Calibration (Light) execution procedure, refer to “Calibrating This Instrument” in “CX1000 User’s Manual”.